At a glance
Before you start
You need:- A Smartsheet account with access to the sheets you want to use.
- An allowed integration. An owner or admin sets Smartsheet to Allow under Admin → Connectors → Catalogue.
- Editor sharing permission or higher on a sheet to add or update rows, and Commenter or higher to add comments. Viewer access is enough to read.
Hebno does not request
ADMIN_SHEETS, DELETE_SHEETS, SHARE_SHEETS or ADMIN_WORKSPACES, so it cannot change columns, delete sheets or change sharing.
Connect Smartsheet
1
Start the connection
Open Settings → Connections, find Smartsheet and select Connect. You can also select Connect from the prompt in a chat.
2
Sign in to Smartsheet
Sign in, check the access Hebno requests, and select Allow.
3
Return to Hebno
The card shows Connected with your Smartsheet email address.
What Hebno reads
Hebno reads cell values by column type, so a contact column returns names, a date column returns a date and a symbol column returns its label, such as Red or At Risk. Formulas return their calculated value.
Reads are live. Hebno queries Smartsheet when a request needs it. Only what a reply used is stored with the conversation as its sources.
What Hebno writes
Every write appears first as a confirmation card. You can change any field before you select Confirm.
A Smartsheet change pending confirmation. Nothing is written until you confirm.
Link a project to a sheet
Linking marks which Smartsheet sheets and reports belong to an engagement, so you can ask “what is at risk?” without naming the sheet.- Open the project and select Brain.
- Under Linked records, select Link record, then Smartsheet.
- Search by sheet or report name and select it. Repeat for each sheet or report in the engagement.
Use Smartsheet in chat
-
Attach: open the + menu, choose Sources → Smartsheet, and pick a sheet, a row, a report or a dashboard. Or type
/and choose Smartsheet. -
Ask: name the sheet, report or person in your request. For example:
List every row on the Contoso pricing review plan that is at risk or past its end date, with the owner and latest comment.
Draft a steering committee update from the Contoso status dashboard and the milestones report.
Add a row under Phase 2 for “Validate elasticity results”, owner Priya Nair, end date 20 November.
- Research runs show a Checking Smartsheet step, with a chip for each sheet, report and dashboard it read.
- Agents can read Smartsheet on a schedule, for example a Monday list of rows that moved to red. Writes an agent proposes appear in agent approvals for review.